巖棉保溫板怎么制作的?

發(fā)布時間:2020-11-05 來源:http://gzcsf.net/

巖棉保溫板的制作流程:巖棉板是由玄武巖(礦渣)經(jīng)高爐融化成液狀,經(jīng)高速離心棍甩絲,經(jīng)高速風流噴吹,形成纖維細度小,柔韌性強的巖棉板纖維,經(jīng)噴吹布棉法.

Production process of rock wool insulation board: rock wool board is made of basalt (slag) melted into liquid form by blast furnace, high-speed centrifugal rod wire throwing, high-speed air flow injection, forming rock wool board fiber with small fiber fineness and strong flexibility, which is sprayed with cotton cloth

用 巖棉板合成專用膠將其噴入巖棉纖維中,將巖棉纖維合成,然后經(jīng)定速擺錘,勻速布棉法將巖棉纖維布棉,經(jīng)履帶轉(zhuǎn)速控制,上下履帶壓制法,壓制成巖棉板,巖棉 板的密度高低由履帶轉(zhuǎn)速控制,及擺錘落棉量決定。

The rock wool fiber is synthesized by spraying it into the rock wool fiber with special glue for rock wool board synthesis, and then the rock wool fiber is cloth cotton by the constant speed pendulum and uniform speed cotton distribution method. The rock wool board is pressed into rock wool board by the track speed control and the upper and lower track pressing method. The density of the rock wool board is controlled by the speed of the track and the amount of cotton dropped by the pendulum.

巖棉經(jīng)擺錘布棉后,由履帶上下壓制法,傳送至高溫烘干爐中,將其烘干,制作成巖棉板后。傳送出烘干爐,經(jīng) 高速切割鋸縱向切割成為寬度均勻的巖棉板長板,后經(jīng)高速切割鋸由微電腦控制,橫向切割成長度相同的巖棉板。

2-20110515303D46.jpg

After rockwool is distributed by pendulum, it is transported to high temperature drying furnace by track up and down pressing method, and then dried to form rock wool board. After being transported out of the drying oven, it is longitudinally cut into a long rock wool board with uniform width by a high-speed cutting saw, and then the rock wool board with the same growth degree is horizontally cut by the high-speed cutting saw controlled by a microcomputer.

紅經(jīng)傳送帶傳送至包裝設(shè)備。由設(shè)備自取法將巖棉 板單板重疊成固定包裝數(shù)量的巖棉板。后經(jīng)傳送帶將巖棉板送至包裝平臺,經(jīng)傳送至熱塑模包裝過程,設(shè)備自動用巖棉板熱縮專用膜將巖棉板包裹,由傳送設(shè)備將熱 縮膜包裹巖棉板送至熱縮收縮爐.

Red is conveyed to the packaging equipment by conveyor belt. The rock wool board veneer is overlapped into rock wool board with fixed packing quantity by equipment self taking method. After that, the rock wool board is sent to the packaging platform by the conveyor belt, and then transported to the thermoplastics packaging process. The rock wool board is wrapped by the special film of rock wool board automatically, and the rock wool board is wrapped by the heat shrinkable film by the conveying equipment and sent to the heat shrinkable furnace

經(jīng)高溫烘制使其收縮膜自然收縮,將巖棉板嚴緊包裹,再由傳送設(shè)備傳送至運輸車,運輸至巖棉板存放庫。這樣整個巖棉板制作過 程就已完成。

After high temperature drying, the shrinkage film shrinks naturally, and the rock wool board is tightly wrapped, and then transported to the transport vehicle by the conveying equipment, and then transported to the rock wool board storage warehouse. In this way, the whole production process of rock wool board has been completed.